Projects

Completed Project's

MOUNDED STORAGE VESSEL

2018 - BPCL, Raipur, Chattisgarh
Fabrication, Erection, Welding, Testing and Commisioning of 3 × 300 MT MSV at Raipur

2018 - BPCL, Wai, Maharashtra
Fabrication, Erection, Welding, Testing and Commisioning of 2 × 300 MT MSV at Wai

2018 - BPCL, Bakania, Maharashtra
Fabrication, Erection, Welding, Testing and Commisioning of 3 × 300 MT MSV at Bakania

2018 - BPCL, Jalgoan, Maharashtra
Fabrication, Erection, Welding, Testing and Commisioning of 3 × 300 MT MSV at Jalgoan

2018 - IOCL Kondapally, Vijaywada, AP
Supply, Fabrication, Erection & Testing of 3 × 600 MT Mounded Pressure Vessel for LPG storage & allied facilities for LPG Storage and allied facilities at IOCL LPG Bottling Plant, Kondapally, AP

2018 - IOCL Banka Bihar
Construction of 3 x 600 MT Capacity Mounded Type Pressure Vessel for LPG Storage & 3 Nos Cone roof Vertical Water Storage Tanks at LPG Bottling Plant Project at Banka, Bihar

2018 - IOCL, Bhatinda, Punjab
Construction of 3 x 600 MT Capacity Mounded Type Pressure Vessel for LPG Storage & 3 Nos Cone roof Vertical Water Storage Tanks at LPG Bottling Plant Project at Bhatinda, Punjab

 

FABRICATED STORAGE TANKS

2018 - Limited Reliance Industries
Design, Fabrication, Construction, Field Erection, Handling, Installation, Assembly, Testing, Evaluation, Paint Application and Quality Assurance for the specified Tanks - 6 Nos at PCG Complex, J3 Project, Jamnagar

2018 - Limited Reliance Industries
Design, Engineering and Site Tankage Modification jobs at ZRTF area - 2

 

MOUNDED STORAGE VESSEL

2017 - IOCL, Haridwar, Uttarakhand
Supply, Fabrication, Erection & Testing of 2 × 900 MT Mounded Pressure Vessel for LPG storage & allied facilities at IOCL LPG Bottling Plant at Haridwar

 

FABRICATED STORAGE TANKS

2017 - Aegis Gas, Haldia
Fabrication, Erection, Welding, Testing and Calibraton of 2 Nos Cryogenic LPG Tanks (Capacity 12500 MT) at Haldia

 

FABRICATED STORAGE TANKS 

2017 - Aegis Gas , Pipavav, Gujarath
Construction of 6 Nos LPG/Propane Sphere (19.2 M Dia × 54.5 - 56 mm Thk) - Design, Engineering, Fabrication, Erection of LPG/Propane Sphere including structural platform Blasting, Painting, Fire Proofing & Complete in all Respect.

 

MOUNDED STORAGE VESSEL

2016 - HPCL, Bhopal, Madhya Pradesh
Detailed Engineering, Design, Supply, Fabrication, Erection, Testing & Commissioning of 3 × 500 MT Mounded LPG Storage Pressure Vessels - Bhopal

 

MOUNDED STORAGE VESSEL

2015 - IOCL Belgaum,Karnataka
Supply of material, fabrication, erection, testing and commissioning oI 2 x 1200 MT capacity Mounded type Pressure Vessels at LPG Bottling Plant, Belgaum (Karnataka)


FABRICATED STORAGE TANKS

2015 - HPCL Bhopal, MP
Supply, Fabrication, Erection, testing of 2 Nos MS water Tanks (18 mtr. Dia × 12 Mtr. Height)

2015 - Adani Hazira Port, Gujarath
Fabrication, Painting, Installation & Commissioning of 46 Nos Storage Tanks for Liquid Terminal at AHPPL, Hazira

2015 - IOCL, Kandla
Revamping of Double wall refrigerated LPG Storage Tanks & Allied Facilities at LPG Import Plant, Kandla

 

HORTON SPHERES EXECUTED

2015 - Aegis Gas (LPG) Pvt.Ltd. Navi Mumbai.
Construction of 2 Nos. (18 M Dia × 49.5 - 52 mm Thk) Propane Horton Spheres at Pipavav,Gujarat.


MOUNDED STORAGE VESSEL

2014 - HPCL Yediyur, Bangalore
Detailed Engineering, Design, Supply, Fabrication, Erection, Testing & Commissioning of 3 X 700 MT capacity Mounded LPG Storage Pressure Vessels at Yediyur (Bangalore) LPG Plant.

2014 - HPCL Dharwad, Karnataka
Detailed Engineering, Design, Supply, Fabrication, Erection, Testing & Commissioning of 3 X 650 MT capacity Mounded LPG Storage Pressure Vessels at Dharwad LPG Plant.


FABRICATED STORAGE TANKS

2014 - HPCL., Mumbai
Construction of 2 X 3500 KL Water Tanks at Yediyur (Bangalore) LPG Plant.

 

FABRICATED STORAGE TANKS

2012 - Samsung Engineering Co. Ltd., Korea.
Design, Supply, Fabrication and Erection of 3 Nos. Storage Tanks for OPaL Dual Feed Ethylene Cracker Project, Dahej : 15 M Dia. x 11.3 M Height Dome Roof, 12 M Dia. x 8.4 M Height Dome Roof and 7.2 M Dia. x 10.3 M Height Cone Roof.

2012 - Punj Lloyd Ltd., Chennai.
Fabrication and Erection of 2 Nos. Refrigerated Double Wall Tanks with Suspended Deck at Indianoil Petronas Pvt. Ltd., LPG Export / Import Terminal, Ennore, Tamil Nadu. 46.8 M Dia. x 20.296 M Height Outer Tank & 45.2 M Dia. x 18.7 M Height Inner Tank.


HORTON SPHERES EXECUTED

2012 - BOC India Ltd., Kolkata
Design, Engineering, Supply of Horton Spheres Components, Site Fabrication, Erection and Commissioning of 2 Nos. Horton Spheres at BOC India Ltd., 853 x 2 TPD BOO Plant, near Fertiliser Gate, Rourkela, Orissa

 

MOUNDED STORAGE VESSEL
2011 - HPCL Anantapur, Andhrapradesh
Design, Supply, Fabrication, Erection, Testing and Commissioning of 3 x 350 MT Mounded Storage Vessels at their Anantapur LPG Plant.


FABRICATED STORAGE TANKS

2011 - HPCL., Mumbai.
Construction of Additional Product Tankage at Jaipur:28 M Dia. x 14 M Height & 18M Dia. x 13M Height SingleDeck Floating Roof.

 

MOUNDED STORAGE VESSEL

2010 - HPCL Visakapatnam, Andhra Pradesh
Construction of 3 x 1300 MT Cap. LPG., 2 x 250 MT Cap. Propylene Mounded Storage Vessels at their Proposed LPG Terminal, Visakhapatnam, A.P.

2010 - HPCL Ajmer, Rajastan
Fabrication, Erection, Testing & Commissioning of 3 x 700 MT cap. Mounded LPG Storage Vessels at HPCL., Ajmer LPG Plant.

2010 - Indian Oil Petronas Pvt. Ltd., Ennore, Tamil Nadu
Design, Engineering, Supply, Fabrication, Erection, Testing & Commissioning of 2 Nos. 300 MT Mounded Bullets at Indianoil Petronas Pvt. Ltd., Propane/ Butane/ LPG Import Terminal Project, Ennore, Tamil Nadu.


HORTON SPHERES EXECUTED

2010 - IOCL, Mumbai
Dismantling, shifting and re-erection of 3 x 600 MT Cap. Horton Spheres from LPG Plant, Sawaimadhopur (Rajasthan) to LPG Plant, Nabha, Patiala (Punjab)

 

MOUNDED STORAGE VESSEL

2009 - HPCL Bahadurgarh, New Delhi
Fabrication, Erection, Testing & Commissioning of 2 x 1000 MT Capacity Horizontal Mounded LPG Storage Pressure Vessels at HPCL., Bahadurgarh, LPG Plant.

2009 - HPCL Cherlapalli, Andhra Pradesh
Fabrication, Erection, Testing & Commissioning of 2 x 800 MT Capacity Horizontal Mounded LPG Storage Pressure Vessels at HPCL., Cherlapalli LPG Plant.


FABRICATED STORAGE TANKS

2009 - Samsung Engineering Co. Ltd., New Delhi.
Design, Supply and Construction of Site Erected Tanks and Equipment at Indian Oil Corporation Ltd., Panipat Naphtha Cracker Project (Shop & Site work).

2009 - Essar Construction (India) Ltd.,Jamnagar.
Design, Engg. Fabrication and Erection / Installation, Testing & Calibration of 2 Nos. 62 M Dia. x 20 M Ht. & 2 Nos. 44 M Dia. x 20 M Ht. Floating Roof Tanks (Group-III-PIT Area) at Essar Oil Refinery Project, Khambhalia,Jamnagar.


HORTON SPHERES EXECUTED

2009 - IOCL, Mumbai
Dismantling, shifting and re-erection of 2 x 1200 MT Horton Sphere from LPG Hazira Plant to LPG Sanand Plant.

2009 - Punj Lloyd Ltd., New Delhi
Design, Engineering, Site Fabrication, Erection, Inspection & Testing of 7 Nos. (Tag Nos.68-TS-007, 68-TS-008A, 68-TS-008B, 68-TS-009A, 68-TS-009B, 68-TS-009C, 68-TS-009D) Horton Spheres for IOCL, Naptha Cracker Project, Package EPCC-8, Panipat.


MOUNDED STORAGE VESSEL

2008 - HPCL Loni, Uttar Pradesh
Fabrication, Erection, Testing & Commissioning of 3 x 1000 MT Capacity Horizontal Mounded LPG Storage Pressure Vessels at their Loni LPG Plant.


FABRICATED STORAGE TANKS

2008 - Reliance Petroleum Ltd., Jamnagar.
Design, Partial Supply and Construction of Double Deck Floating Roof, Cone Roof and Dome Roof Tanks of various sizes (varies from 5 M Dia. to 36 M Dia.) at their Jamnagar Refinery Complex.

 

HORTON SPHERES EXECUTED

2008 - Toyo Engineering India Ltd., Mumbai
Erection of 6 Nos. Horton Spheres (20 Mtrs Dia x 57.7 to 59.9 mm thk 2Nos., intended for C2, 15.5 Mtrs Dia x 27.5 to 29.2 mm thk 2 Nos.,intended for C3 and 13 Mtrs Dia x 17.5 to 18.8 mm thk 2 Nos. intended for C4) at ONGC., Dahej, Gujarat.